Our projects
VILLAMAÑÁN – SPAIN – 1,1 MW
Installed capacity:
1,1 MW
Location:
Villamañán (León)
Date:
2008
PRONATURE/PSP4 – SPAIN – 0,095 MW
Installed capacity:
0,095 MW
Location:
Puertollano (Cuidad Real)
Date:
2008