Our projects
MEDINA – SPAIN – 30 MW
Installed capacity:
30 MW
Location:
Medina del Campo (Valladolid)
Date:
2019
POLEÑINO – SPAIN – 30 MW
Installed capacity:
30 MW
Location:
Poleñino (Huesca)
Date:
2019
EL BALDÍO – SPAIN – 20 MW
Installed capacity:
20 MW
Location:
Casatejada (Cáceres)
Date:
2019
TORDESILLAS 2 – SPAIN – 50 MW
Installed capacity:
50 MW
Location:
Tordesillas (Valladolid)
Date:
2019
TORDESILLAS 1 – SPAIN – 30 MW
Installed capacity:
30 MW
Location:
Tordesillas (Valladolid)
Date:
2019