Our projects

TORDESILLAS 3 – SPAIN – 15 MW

Installed capacity:

15 MW

Location:

Tordesillas (Valladolid)

Date:

2019

MEDINA – SPAIN – 30 MW

Installed capacity:

30 MW

Location:

Medina del Campo (Valladolid)

Date:

2019

POLEÑINO – SPAIN – 30 MW

Installed capacity:

30 MW

Location:

Poleñino (Huesca)

Date:

2019

EL BALDÍO – SPAIN – 20 MW

Installed capacity:

20 MW

Location:

Casatejada (Cáceres)

Date:

2019

TORDESILLAS 2 – SPAIN – 50 MW

Installed capacity:

50 MW

Location:

Tordesillas (Valladolid)

Date:

2019

TORDESILLAS 1 – SPAIN – 30 MW

Installed capacity:

30 MW

Location:

Tordesillas (Valladolid)

Date:

2019