Our projects

HERDADES DOS CANHOES – 13.7 MW

Installed capacity:

13.7 MW

Location:

Alandroal

Date:

2022

MENDO MARCO – 23.3 MW

Installed capacity:

23.3 MW

Location:

Arraiolos

Date:

2022

MONTE FALCATO – 14.1 MW

Installed capacity:

14.1 MW

Location:

Elvas

Date:

2022

CASTOR – 50 MW

Installed capacity:

50 MW

Location:

Toledo

Date:

2021

URSA – 50 MW

Installed capacity:

50 MW

Location:

León

Date:

2021

ALGIEDI – 25 MW

Installed capacity:

25 MW

Location:

Palencia

Date:

2021